Electronic Systems Installation 1 (C-307) Exam Prep
Free practice questions

Free C-307 Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free C-307 questions are organized by exam domain, so you can see how each part of the Electronic Systems Installation 1 (C-307) blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: adhering to electronic installation safety rules

Question 1

Following a VFD shutdown, a qualified technician locks out all supplies and completes the required restart checks. The manufacturer's access procedure requires a wait of at least 10 minutes and a DC-bus reading below 50 V at designated test points. After 12 minutes, an appropriate, verified meter reads 72 V DC; the display is dark. What should govern access to the bus terminals?

Show answer & explanation

Correct answer: D - The measured bus voltage, which remains above the permitted access threshold.

Domain 2: using proper PPE

Question 2

A pair of rubber-insulating gloves has remained properly stored in its unopened original packaging since passing the manufacturer's electrical test nine months ago. The package is opened for the first time today; inspection and the air test pass. The glove class and protector gloves are suitable for the assigned task. Under OSHA 29 CFR 1910.137, what does the nine-month test age mean for first issue?

Show answer & explanation

Correct answer: A - First issue is permitted; the factory test is less than 12 months old.

Domain 3: reading wiring installation diagrams with PLCs/HMIs/VFDs

Question 3

Six PNP proximity sensors share a 24 V DC PLC input group whose common is connected to 0 V. A seventh sensor must be NPN; its output switches to 0 V when actuated. The card allows sourcing or sinking inputs, but all channels in a group share one common. A second, independently configurable group is unused. Which connection accommodates the NPN sensor while preserving the six working inputs?

Show answer & explanation

Correct answer: C - Connect the NPN sensor to the unused group, with that group's common connected to +24 V.

Question 4

A PLC's isolated relay output must command a VFD to run when the relay energizes and stop when it releases. The drive diagram identifies P24 as its +24 V control source, DI1 as RUN when connected to P24, and DCOM as its control return. The relay has COM, NO, and NC contacts but supplies no voltage. The PLC and drive use separate 24 V supplies whose returns are not connected. Select the correct wiring.

Show answer & explanation

Correct answer: D - Drive P24 to relay COM; relay NO to drive DI1.

Domain 4: cabinet mounting PLCs/HMIs/VFDs

Question 5

An HMI passes its functional checks, but a gap remains under one corner of its front bezel. Its mounting instructions allow at most 0.5 mm deviation from a flat sealing surface and specify 0.2 N·m clip torque. The cutout and wall thickness meet specification. At the gap, the wall is bowed by 0.9 mm; the gasket is undamaged and every clip is at the specified torque. Which action addresses the sealing defect?

Show answer & explanation

Correct answer: B - Restore the mounting surface's flatness, then refit the HMI using the specified clip torque.

Domain 5: wire routing and grounding PLCs/HMIs/VFDs

Question 6

A VFD accepts the PLC's terminal RUN command with no fault or active inhibit, yet its commanded-frequency monitor stays at 0.0 Hz. The PLC's speed output measures 6.0 V at AI1, which is correctly configured for the 0-10 V signal. The selected command source is terminals; the selected speed-reference source is keypad, set to 0.0 Hz. With the machine secured for the authorized motion test, which correction restores PLC speed control?

Show answer & explanation

Correct answer: A - Select AI1 as the speed-reference source and retain terminal control of RUN.

Domain 7: installing Modbus and Ethernet communications network

Question 7

A PLC reliably reads a VFD's speed-feedback holding register over Modbus RTU. A new function 03 request for six registers beginning at protocol address 200 receives a valid exception 02 response. The drive's register map lists readable holding registers at addresses 200 through 203; addresses 204 and 205 are not implemented. What change resolves this request error?

Show answer & explanation

Correct answer: A - Reduce the requested quantity from six registers to four.

Question 8

A 45 m Cat 5e cable for a 100BASE-TX HMI link passes a simple continuity test: pin 1 connects to pin 1, continuing through pin 8, with no shorts. Both plugs place the green pair on pins 3 and 4 and the blue pair on pins 5 and 6; the other pairs follow T568B. The link is unreliable. Which repair addresses the wiring defect?

Show answer & explanation

Correct answer: C - Reterminate both ends to T568B: green pair on 3/6, blue pair on 4/5.

Domain 8: installing analog input transmitters and analog sensors

Question 9

A calibrated source is connected to a passive PLC current input, and the PLC reports each injected current correctly. The HMI should convert a linear 4-20 mA signal into 0-200 °C, but it displays 40 °C at 4 mA, 120 °C at 12 mA, and 200 °C at 20 mA. Which conversion error would produce all three readings?

Show answer & explanation

Correct answer: B - The HMI maps 0-20 mA linearly to 0-200 °C.

Question 10

A transmitter reads the correct temperature with a Pt100 simulator connected directly at its terminals. Moving the same simulator to the sensor end of the three-wire field cable introduces an error that changes as the cable warms. Terminal assignments are correct. This transmitter's compensation requires equal resistance in leads L1 and L2; isolated cable measurements are 4.0 Ω and 1.0 Ω, respectively. Two-wire mode is also supported. The appropriate repair is to:

Show answer & explanation

Correct answer: C - Replace the field cable with matched three-conductor cable, then retest.

The rest of the C-307 blueprint

The C-307 exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more C-307 questions with explanations.

Continue in the free practice test →

View plans